We were employed by HyD to conduct Investigation, Design and Construction Supervision for two areas.
- Elevator and Pedestrian Walkway System between Kwok Shui Road Park and Kwok Shui Road
- Elevator and Pedestrian Walkway System between Healthy Street East and Pak Fuk Road
The aim of the project is to enhance the accessibility of hillside areas through construction / installation of a mix of pedestrian facilities. The locations of the proposed pedestrian walkway system is in close proximity to MTRC stations. We also have to overcome land issues and limited working space for the construction of the pedestrian walkway and lifts. MiC for the lifts and NEC4 contract strategy will be provided for this assignment.