We have been appointed as the Advisor and RSE for the proposed installation of Poseidon System for both the Main Pool and Training Pool at Sun Yat Sen Memorial Park Swimming Pool. We have conducted feasibility study, facilitated the construction team and gauged the consensus with ArchSD and LCSD to ensure prompt design approval and commencement of the works. The project entails installing of the Poseidon System, along with an IR illuminator, which will be connected to a steel hanger post and mounted on the existing truss frame.