We have been appointed by Kai Tak Sports Park as the lead consultant for the design of the turf nursery at Kai Tak Sports Park. Our responsibility is to provide consultancy services for the design of the turf, which will be relocated from the TKO-I landfill site in the reclamation area and transplanted to the Main Stadium for the football event period. The project is set to be completed by early 2025. Our main role entails designing the site formation, including tasks such as filling, excavation, slope works, and the design of a sub-soil drainage system to cater the surface runoff. Additionally, we are responsible for designing the irrigation water supply system and road works to ensure proper vehicular access to the main area.