NEC Awards 2020 Winner “Transport Contract of the Year” – Tuen Mun Road Town Centre Section Noise Barriers
https://www.neccontract.com/projects/retrofitting-noise-barriers-on-tuen-mun-road-hong-kong
https://www.neccontract.com/projects/retrofitting-noise-barriers-on-tuen-mun-road-hong-kong
We were engaged by CEDD to provide M&A services for the entrusted works undertaken by WKCDA in relation to the design and SI of the Zone 2A IB including…
Mannings has been employed by CEDD as the NEC Advisor for the design and construction of this 4.2km long dual two-lane highway connecting Tseung Kwan O and East Kowloon…
Appointed by CEDD/NTW to provide design review and construction supervision for this NEC (ECC Option B) Construction of a new cycle track (with footpath) which is about 11km in…
Appointed by HyD and we have evaluated several Options for HyD leading to recommended Option A contract which is now under construction stage. We have formulated the contract strategy,…
We were appointed by CEDD and its Phase 2 works including entrance plaza , road improvement and public transport hub is adopting NEC Option B. We have completed NEC…
We were employed by HyD and the Package 2 of this project is NEC. At the early stage of this assignment, we had swiftly arranged NEC workshop and option…
We were appointed by CEDD and the second contract of this consultancy is to adopt NEC type. We have completed NEC options evaluation and NEC workshop to the entire…
We are the Supervisor and have completed this Option C contract for the works near Po Nga Court (Contract No. HY/2010/10). This contract is Government’s third NEC pilot project…