CE 60/2015 (HV) Lift and Pedestrian Walkway System between Kwai Shing Circuit and Hing Shing Road, Kwai Chung – Design and Construction
We were engaged by Hyd for the pedestrian walkway and lift system at Kwai Shing Circuit (KSC) and Hing Shing Road (HSR) to promote walking as a means of…
CE 18/2018 (HY) Retrofitting of Noise Barriers on Po Lam Road North and Po Ning Road
We have been engaged by HyD since October 2018 to investigate, design and construction supervision for the retrofitting of cantilever/vertical Noise Barriers and/or Semi-Noise Enclosures to 3 road sections…
CE 57/2016 (HY) Lift and Pedestrian Walkway System between Tai Wo Hau Road and Wo Tong Tsui Street, Kwai Chung – Design and Construction
We were engaged by the HyD for the pedestrian walkway using inclined lift system which is the first inclined lift ever installed by Hyd. Our team together with HyD…
CE 53/2018 (HY) Provision of UAF at Footbridges, Elevated Walkways and Subways Package 6 – Investigation, Design & Construction
Again, we were employed by HyD in September 2019 for this Assignment under the under the Third Phase of the UAP, including provision of UA facilities as well as…
CE 52/2018 (HY) Provision of UAF at Footbridges, Elevated Walkways and Subways Package 5 – Investigation, Design & Construction
We were employed by HyD in June 2019 for this Assignment under the Third Phase of the UAP, including provision of UAF as well as associated works for 48…