SD/2018/01 Footbridge across Hip Wo Street near the Junction of Hip Wo Street/Mut Wah Street
We are the NEC advisor for this Contract to construct 4 to 6-metre wide footbridge, with an about 39-metre long curved main deck, and two arms of about 6…
We are the NEC advisor for this Contract to construct 4 to 6-metre wide footbridge, with an about 39-metre long curved main deck, and two arms of about 6…
We were engaged by Hyd for the pedestrian walkway and lift system at Kwai Shing Circuit (KSC) and Hing Shing Road (HSR) to promote walking as a means of…
We have been engaged by HyD since October 2018 to investigate, design and construction supervision for the retrofitting of cantilever/vertical Noise Barriers and/or Semi-Noise Enclosures to 3 road sections…
We were engaged by the HyD for the pedestrian walkway using inclined lift system which is the first inclined lift ever installed by Hyd. Our team together with HyD…
Again, we were employed by HyD in September 2019 for this Assignment under the under the Third Phase of the UAP, including provision of UA facilities as well as…
We were employed by HyD in June 2019 for this Assignment under the Third Phase of the UAP, including provision of UAF as well as associated works for 48…