We have completed the design for BD submission and TCP construction supervision (AP/RSE/RGE streams) leading to construction completion of 3-storey block and one level of basement with raft foundation which includes 8 classrooms, an indoor swimming pool and a multi-purpose assembly hall for St. Margaret’s Co-Educational English Secondary & Primary School. The contract type is Design & Build that required BD submission. Our design has included General Building Plan, Structural Plan, Drainage Plan and ELS Plan for BD submission including full time supervision for 24 months. The occupation permit was granted by BD in August 2018 (BD Ref: 2/9141/15). The total GFA is 2895 m2.
