We were engaged by Hyd for the pedestrian walkway and lift system at Kwai Shing Circuit (KSC) and Hing Shing Road (HSR) to promote walking as a means of transport for 32,300 people (i.e. about 16,200 users per day) using the 30m high triple lifts and 60m long elevated covered walkway connecting KSC and HSR. Our team has promptly overcome congested utilities, derived traffic diversion scheme for steelworks erection and tactfully addressed public concerns for this contract successfully awarded in May 2017 “HY/2017/02 Lift and Pedestrian Walkway System between Kwai Shing Circuit and Hing Shing Road” for completion before 2020.
