MTRC SCL 1114 Pedestrian Links at Tsz Wan Shan
As Designer for the Cost Saving Design for 13 pile cap lift and footbridge structures by adoption of vertical dia. 323mm mini-pile instead of pre-bored H-pile to minimize disturbance…
As Designer for the Cost Saving Design for 13 pile cap lift and footbridge structures by adoption of vertical dia. 323mm mini-pile instead of pre-bored H-pile to minimize disturbance…
We were employed by the Main Contractor as Designer for the construction sequencing, method statement, excavation and lateral system, dewatering and the associated temporary works design involving BD submission.…
At Hung Hom Station, as a result of the improvement of air conditioning, two machine rooms and a transformer room together with ducting modification are required. The two machine…
We were directly employed by MTRC as Engineering Consultant for Slope Inspection Works along Operating Railways, including Tsuen Wan Line, Kwun Tong Line, Island Line, South Island Line Tseung…
We were employed by MTRC as Engineering Consultant to carry out the consultancy services for engineer inspection for maintenance of slopes and retaining walls at City Point. We are…
We were directly employed by MTRC to undertake the Consultancy Agreement A060-09C as Engineering Consultant for Slope Inspection Works along East Rail Line, West Rail Line, Light Rail and…
We have undertaken the structural condition survey including the non-destructive testing for the 6 stations. Our works were completed within the tight time frame of MTRC and our reports…
We were engaged by MTRCL since Oct 2018 to further improve the travel environment and service efficiency while facilitating passenger flow of various stations. MTRCL intends to replace 39…
BD Submission and TCP Supervision for the construction of a new Light Rail Stop and its associated works. Duration : 2015-2016