We were engaged by MTRCL since Oct 2018 to further improve the travel environment and service efficiency while facilitating passenger flow of various stations. MTRCL intends to replace 39 nos. of hydraulic lifts to traction lifts at various stations to upkeep the service level of the Corporation and to ensure the lift can operate safely without compromising the performance during the design life. In addition, we will conduct a detailed site survey at Choi Hung Station, conduct comprehensive structural feasibility studies and prepare reports for the lift shafts to assess the structural integrity of all affected structural elements.
Duration | : | Oct 2018-2022 |