We have undertaken the structural condition survey including the non-destructive testing for the 6 stations. Our works were completed within the tight time frame of MTRC and our reports were submitted in timely manner. We had carried out detailed condition survey for the six East Rail Station (University, Tai Wo, Tai Po Market, Fanling, Sheung Shui and Lok Ma Chau). The whole survey was divided into three parts, i) public accessible area, ii) non-public accessible areas and iii) non-destructive tests of structural elements or architectural fixtures.
Duration | : | 2008-2009 |