We were engaged by HyD to design and construct the Footbridge B which is one of the 3 footbridges of TW town centre in connecting with the existing pedestrian walkways and the two nearby MTR stations, on the western side of Tai Chung Road (TCR) and Hoi Shing Road (HSR). The proposed footbridges FB1, FB2 and FB3 will connect with the 3 existing footbridges.