The site formation and associated infrastructural works for the development of columbarium at Sandy Ridge Cemetery is to be carried out under Civil Engineering and Development Department (CEDD) Contract No. CV/2016/10. Hsing Chong Tsun Yip Joint Venture (the Contractor) has awarded the Contract for the site formation and infrastructural works. We are appointed by the Contractor to conduct geological mapping of all newly formed soil/ rock slopes. We are responsible to present the results of geological mapping of newly formed slopes including soil description, indication of any boundaries between different soil types and indication of any adverse geological features such as relict discontinuity and kaolin seams.