Mannings were the designer for this design and build assignment for the recreational development between Junk Bay and Clearwater Bay Peninsular of TKO for HyD/W of the 80m clear span innovative arch channel crossing bridge with cycle track running along the east bank of the Eastern Channel, together with a lift linking the northern and western side of the landfill site to the southeast of TKO Town Centre.










