We were engaged by HyD to undertake the pedestrian connectivity works with footbridge and lift, to promote walking as a means of transport mode for the local residents. We have derived pedestrian link options for HyD and obtained blessing from LCSD about partly occupation of Tai Loong Street playground for accommodating the permanent works and working area.