Mannings (Asia) Consultants Ltd

Environmental Study

Mannings (Asia) Consultants Ltd have undertaken a wide variety of environmental studies including:

  1. Retrofitting of Noise Barriers on Tai Po Tai Wo Road
  2. Upgrading of Remaining Sections of Kam Tin Road and Lam Kam Road – EIA
  3. Sai Kung Public Pier No 2 Project – Independent Environmental Checker
  4. Agreement No WD 5/2007 Tseung Kwan O Further Development Infrastructure Works for TKO Stage I Landfill Site – Study on Impact on Environment, Drainage and Stability of Existing Seawall
  5. Construction of Yung Shue Wan Helipad – Independent Environmental Checker
  6. CEDD Contract No CV/2006/06 Seawall upgrading works for Ma On Shan Waterfront Promenade – Independent Environmental Checker
  7. CEDD Contact No TP 36/02 Tai Po Development Upgrading of Ting Kok Road between Tai Po East Fire Station and Shuen Wan – Noise Barrier Checking
  8. Contact No 06/8001 Lamma Power Station Extension Unit 4 & 5 Retrofits of FGD Plant Light Oil Facilities Demolition & Site Clearance Soil Contamination Site Investigation – Environmental Consultant
  9. Taikoo Shing Site Formation Project - Independent Environmental Checker
  10. HyD Contract No HY/2004/07 Design and Build of Fortress Hill Pedestrian Link – Evaluation and Application of Night Construction Permit

Condition Survey

Mannings (Asia) Consultants Ltd have had wealth of experience in condition survey for various kinds of projects including:

  1. MTRC Contract No 2007-2003 Noise Mitigation Measures at Wo Liu Hang, Fo Tan
  2. GEO Contract No GE/2005/51 10-Year Extended LPM Project Ph 5, Package M, Landslip Preventive Works for Slopes in Shatin, Kowloon and Kwai Tsing
  3. GEO Contract No 5/WSD/07 Construction of Service Reservoirs, Pumping Station and Associated Main Laying
  4. GEO Contract No GE/2007/17 10-Year Extended LPM Project Ph 4, Package A, Landslip Preventive Works for Slopes in Tsuen Wan and Kwai Chung (Batch B)
  5. HyD Contract No HY/2007/07 Retrofitting of Noise Barriers on Tseung Kwan O Road
  6. DSD Contract fro Upgrading of Pillar Point Sewage Treatment Plant – Consultancy Services for Structural Condition Survey and CCTV
  7. DSD Contract No DC/2006/01 Drainage Improvement Works in Sai Kung
  8. KCRC Service Order No 44127721 – Condition Survey Service to 6 East Rail Stations
  9. DSD Contact No DC/2005/09 Drainage Improvement Works in Kau Lung Hang, Yuen Leng, Nam Wa Po and Tai Hang Areas and Construction of Ping Kong Drainage Channels
  10. DSD Contract No DC/2005/12 Drainage Improvement in East Kowloon – Package B